Bc 51 29SJ 395 Room: Room 21 Story: 1st Story Year 1972
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West
Start: 20/6/1972 End: 20/6/1972 Person Days: 1.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 21 Story: 1st Story Wall: West Interior Year 1972
Treatment
Photo type: Form Vol_70_v70_126
Image #: f02483
Catalog #:        Accession #:
Treatment:








Bc 51 29SJ 395 Room: Room 21 Story: 1st Story Wall: West Interior Year 1972
Condition
Photo type: Before Vol_70_v70_127
Image #: 065827
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Basal Erosion
     Loose Stone(s)
     Repatch wall








Bc 51 29SJ 395 Room: Room 21 Story: 1st Story Wall: West Interior Year 1972
Treatment
Photo type: After Vol_70_v70_128
Image #: 065828
Catalog #: 66777        Accession #: 743
Treatment:
Treatment comment: Repatching job was done over the doorway.
Other Treatment:
     Reset the Stone(s)
     Repatched Wall
     Repaired Basal erosion (mortar/stone)