Bc 51 29SJ 395 Room: Room 28 Story: 1st Story Year 2002
Capping Mortars
# of buckets Source Material
Dirt 13 Cans Cups of color
8.0 Sand Describe Color:
Clay Duraweld-C (1:4)
4.0 Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 30/5/2002 End: 30/5/2002 Person Days: 1.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 28 Story: 1st Story Wall: West Capping Year 2002
Treatment
Photo type: After 98322
Image #: 098322
Catalog #:        Accession #:
Treatment:
Treatment comment: Capping was repaired with mortar and stone where needed.








Bc 51 29SJ 395 Room: Room 28 Story: 1st Story Wall: West Capping Year 2002
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 51 29SJ 395 Room: Room 28 Story: 1st Story Wall: South Capping Year 2002
Condition
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Note:
     Original db Other: capping Original db Condition: Poor








Bc 51 29SJ 395 Room: Room 28 Story: 1st Story Wall: South Capping Year 2002
Treatment
Treatment:
Repointing (sq ft): 3.0
Stone replaced (#): 4.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 28 Story: 1st Story Wall: North Capping Year 2002
Condition
Photo type: Before 98317
Image #: 098317
Catalog #:        Accession #:
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Note:
     Original db Other: capping Original db Condition: Poor








Bc 51 29SJ 395 Room: Room 28 Story: 1st Story Wall: North Capping Year 2002
Treatment
Photo type: After 98321
Image #: 098321
Catalog #:        Accession #:
Treatment:
Stone replaced (#): 2.0
Capping: 4.0
Mortar (# buckets): 0.5