Bc 50-Tseh So 29SJ 394 Room: Room 27 Story: 1st Story Year 2002
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 23/5/2002 End: 5/2002 Person Days:
 
Overall Comments: CAPPING



Bc 50-Tseh So 29SJ 394 Room: Room 27 Story: 1st Story Wall: West Capping Year 2002
Treatment
Photo type: After 98183
Image #: 098183
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 8.0
Masonry: 8.0
Mortar (# buckets): 2.0








Bc 50-Tseh So 29SJ 394 Room: Room 27 Story: 1st Story Wall: West Capping Year 2002
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 27 Story: 1st Story Wall: South Capping Year 2002
Treatment
Photo type: After 98182
Image #: 098182
Catalog #:        Accession #:
Treatment:
Treatment comment: Capping was repaired with mortar and stone where needed.








Bc 50-Tseh So 29SJ 394 Room: Room 27 Story: 1st Story Wall: South Capping Year 2002
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 27 Story: 1st Story Wall: North Capping Year 2002
Treatment
Photo type: After 98181
Image #: 098181
Catalog #:        Accession #:
Treatment:
Treatment comment: Capping was repaired with mortar and stone where needed.








Bc 50-Tseh So 29SJ 394 Room: Room 27 Story: 1st Story Wall: North Capping Year 2002
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor