Pueblo Alto 29SJ 389 Room: Room 172 Story: 1st Story Year 2003
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
0.5 Outside park Clay
Comments:
Walls recorded: West, East, North
Start: 2/10/2003 End: 2/10/2003 Person Days: 1.0
 
Overall Comments: After photos for E wall but no indication of treatment work done on that wall



Pueblo Alto 29SJ 389 Room: Room 172 Story: 1st Story Wall: West Interior Year 2003
Treatment
Photo type: After 97903
Image #: 097903
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 7.0
Stone replaced (#): 1.0
Mortar (# buckets): 1.0








Pueblo Alto 29SJ 389 Room: Room 172 Story: 1st Story Wall: West Interior Year 2003
Treatment
Photo type: After 97905
Image #: 097905
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 7.0
Stone replaced (#): 1.0
Mortar (# buckets): 1.0








Pueblo Alto 29SJ 389 Room: Room 172 Story: 1st Story Wall: West Interior Year 2003
Condition
Photo type: Before 94649
Image #: 094649
Catalog #:        Accession #:
Condition:
Stone Erosion: Fair
Mortar Erosion: Fair
Basal Erosion: Fair








Pueblo Alto 29SJ 389 Room: Room 172 Story: 1st Story Wall: East Year 2003
Condition
Photo type: Before 98988
Image #: 098988
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor
Basal Erosion: Poor








Pueblo Alto 29SJ 389 Room: Room 172 Story: 1st Story Wall: East Year 2003
Treatment
Photo type: After 98996
Image #: 098996
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.








Pueblo Alto 29SJ 389 Room: Room 172 Story: 1st Story Wall: East Year 2003
Treatment
Photo type: After 97904
Image #: 097904
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.








Pueblo Alto 29SJ 389 Room: Room 172 Story: 1st Story Wall: North Year 2003
Documentation
Photo type: Documentation, No Treatment 98987
Image #: 098987
Catalog #:        Accession #:
Documentation: