Pueblo Alto 29SJ 389 Room: Room 145 Story: 2nd Story Year 2003
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Local source Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
0.5 Local source Clay
Comments:
Walls recorded: West, East
Start: 24/9/2003 End: 24/9/2003 Person Days: 1.0
 
Overall Comments:



Pueblo Alto 29SJ 389 Room: Room 145 Story: 2nd Story Wall: West Interior Year 2003
Condition
Photo type: Before 98939
Image #: 098939
Catalog #:        Accession #:
Condition:
Loose wall caps: Fair
Stone Erosion: Poor
Mortar Erosion: Poor








Pueblo Alto 29SJ 389 Room: Room 145 Story: 2nd Story Wall: West Interior Year 2003
Treatment
Photo type: After 98950
Image #: 098950
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 3.0
Capping: 0.5








Pueblo Alto 29SJ 389 Room: Room 145 Story: 2nd Story Wall: East Interior Year 2003
Condition
Photo type: Before 98938
Image #: 098938
Catalog #:        Accession #:
Condition:
Loose wall caps: Fair
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Good








Pueblo Alto 29SJ 389 Room: Room 145 Story: 2nd Story Wall: East Interior Year 2003
Treatment
Photo type: After 98949
Image #: 098949
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.