Kin Kletso 29SJ 393 Room: Room 14 Story: 1st Story Year 2010
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South
Start: 13/9/2010 End: 14/9/2010 Person Days: 2.0
 
Overall Comments:



Kin Kletso 29SJ 393 Room: Room 14 Story: 1st Story Wall: West Interior Year 2010
Condition
Photo type: Before 95764
Image #: 095764
Catalog #:        Accession #: 840
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Kin Kletso 29SJ 393 Room: Room 14 Story: 1st Story Wall: West Interior Year 2010
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 15.0
Mortar (# buckets): 1.25








Kin Kletso 29SJ 393 Room: Room 14 Story: 1st Story Wall: South Interior Year 2010
Condition
Photo type: Before 95763
Image #: 095763
Catalog #:        Accession #: 840
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Kin Kletso 29SJ 393 Room: Room 14 Story: 1st Story Wall: South Interior Year 2010
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 24.0
Mortar (# buckets): 1.25