Bc 53-Roberts' Site 29SJ 396 Room: Room 6 Story: 1st Story Year 1975
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color: Desert Tan
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, East
Start: 23/9/1975 End: 26/9/1975 Person Days: 3.0
 
Overall Comments:



Bc 53-Roberts' Site 29SJ 396 Room: Room 6 Story: 1st Story Wall: West Interior Year 1975
Condition
Photo type: Before
Image #: 068882
Catalog #: 66777        Accession #: 744
Condition:
Other Conditions:
     Repatch wall
     Mortar Erosion
     








Bc 53-Roberts' Site 29SJ 396 Room: Room 6 Story: 1st Story Wall: West Interior Year 1975
Treatment
Photo type: After
Image #: 068883
Catalog #: 66777        Accession #: 744
Treatment:
Other Treatment:
     Replaced Mortar
     Reset the Capping Stone(s)
     Repatched Wall








Bc 53-Roberts' Site 29SJ 396 Room: Room 6 Story: 1st Story Wall: South Interior Year 1975
Condition
Photo type: Before
Image #: 068880
Catalog #: 66777        Accession #: 744
Condition:
Other Conditions:
     Repatch wall
     
     Basal Erosion








Bc 53-Roberts' Site 29SJ 396 Room: Room 6 Story: 1st Story Wall: South Interior Year 1975
Treatment
Photo type: After
Image #: 068881
Catalog #: 66777        Accession #: 744
Treatment:
Other Treatment:
     Reset the Capping Stone(s)
     Repatched Wall
     Repaired Basal erosion (mortar/stone)








Bc 53-Roberts' Site 29SJ 396 Room: Room 6 Story: 1st Story Wall: East Interior Year 1975
Condition
Photo type: Before
Image #: 068878
Catalog #: 66777        Accession #: 744
Condition:
Other Conditions:
     Needs Repointing
     Repatch wall
     
     Basal Erosion
     Mortar Erosion








Bc 53-Roberts' Site 29SJ 396 Room: Room 6 Story: 1st Story Wall: East Interior Year 1975
Treatment
Photo type: After
Image #: 068879
Catalog #: 66777        Accession #: 744
Treatment:
Other Treatment:
     Repointing completed
     Repatched Wall
     Replaced Mortar
     Reset the Capping Stone(s)
     Repaired Basal erosion (mortar/stone)