Fortress Site 29SJ2606 Room: Room 1-5 Story: 1st Story Year 2010
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, South, North
Start: 12/7/2010 End: 14/7/2010 Person Days: 3.0
 
Overall Comments:



Fortress Site 29SJ2606 Room: Room 1-5 Story: 1st Story Wall: West Interior Year 2010
Treatment
Photo type: After 95595
Image #: 095595
Catalog #:        Accession #: 840
Treatment:
Basal Wall Repair:
Repointing (sq ft): 10.0
Stone replaced (#): 80.0
Mortar (# buckets): 30.0








Fortress Site 29SJ2606 Room: Room 1-5 Story: 1st Story Wall: South Year 2010
Treatment
Photo type: After 95597
Image #: 095597
Catalog #:        Accession #: 840
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.








Fortress Site 29SJ2606 Room: Room 1-5 Story: 1st Story Wall: South Interior Year 2010
Condition
Photo type: Before 95455
Image #: 095455
Catalog #:        Accession #: 840
Condition:








Fortress Site 29SJ2606 Room: Room 1-5 Story: 1st Story Wall: South Interior Year 2010
Treatment
Photo type: After 95596
Image #: 095596
Catalog #:        Accession #: 840
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 10.0
Stone replaced (#): 58.0
Mortar (# buckets): 28.0








Fortress Site 29SJ2606 Room: Room 1-5 Story: 1st Story Wall: North Interior Year 2010
Treatment
Photo type: After 95598
Image #: 095598
Catalog #:        Accession #: 840
Treatment:
Basal Wall Repair:
Repointing (sq ft): 11.0
Stone replaced (#): 80.0
Mortar (# buckets): 35.0