Bc 51 29SJ 395 Room: Room 7 Story: 1st Story Year 2010
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South
Start: 12/5/2010 End: 13/5/2010 Person Days: 1.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 7 Story: 1st Story Wall: West Interior Year 2010
Condition
Photo type: Before 95253
Image #: 095253
Catalog #:        Accession #: 840
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Bc 51 29SJ 395 Room: Room 7 Story: 1st Story Wall: West Interior Year 2010
Treatment
Photo type: After 95879
Image #: 095879
Catalog #:        Accession #: 840
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 7.5
Stone replaced (#): 3.0
Mortar (# buckets): 2.0








Bc 51 29SJ 395 Room: Room 7 Story: 1st Story Wall: South Interior Year 2010
Condition
Photo type: Before 95252
Image #: 095252
Catalog #:        Accession #: 840
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Bc 51 29SJ 395 Room: Room 7 Story: 1st Story Wall: South Interior Year 2010
Treatment
Photo type: After 95878
Image #: 095878
Catalog #:        Accession #: 840
Treatment:
Repointing (sq ft): 4.0
Stone replaced (#): 6.0
Mortar (# buckets): 1.5