Bc 51 29SJ 395 Room: Room 5 Story: 1st Story Year 2010
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South
Start: 20/5/2010 End: 24/5/2010 Person Days: 2.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 5 Story: 1st Story Wall: West Exterior Year 2010
Condition
Photo type: Before 95263
Image #: 095263
Catalog #:        Accession #: 840
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Bc 51 29SJ 395 Room: Room 5 Story: 1st Story Wall: West Exterior Year 2010
Treatment
Photo type: After 95876
Image #: 095876
Catalog #:        Accession #: 840
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 12.0
Stone replaced (#): 2.0
Mortar (# buckets): 2.0








Bc 51 29SJ 395 Room: Room 5 Story: 1st Story Wall: South Exterior Year 2010
Condition
Photo type: Before 95264
Image #: 095264
Catalog #:        Accession #: 840
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Bc 51 29SJ 395 Room: Room 5 Story: 1st Story Wall: South Exterior Year 2010
Treatment
Photo type: After 95875
Image #: 095875
Catalog #:        Accession #: 840
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 14.0
Stone replaced (#): 9.0
Mortar (# buckets): 2.5