Talus Unit 29SJ 1930 Room: Room 6 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 14/6/2018 End: 19/6/2018 Person Days: 3.0
 
Overall Comments:



Talus Unit 29SJ 1930 Room: Room 6 Story: 1st Story Wall: South Interior Year 2018
Condition
Photo type: Before 002_004003_fy18_b_0000237
Image #: 002_004003_fy18_b_0000237
Catalog #:        Accession #: 914
Condition:
Mortar Erosion: Unspecified








Talus Unit 29SJ 1930 Room: Room 6 Story: 1st Story Wall: South Interior Year 2018
Treatment
Photo type: After 002_004003_fy18_b_0000369
Image #: 002_004003_fy18_b_0000369
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 81.0
Stone replaced (#): 20.0
Stone fresh: 5.0
Mortar (# buckets): 2.0








Talus Unit 29SJ 1930 Room: Room 6 Story: 1st Story Wall: West Interior Year 2018
Condition
Photo type: Before 002_004003_fy18_b_0000238
Image #: 002_004003_fy18_b_0000238
Catalog #:        Accession #: 914
Condition:
Mortar Erosion: Unspecified








Talus Unit 29SJ 1930 Room: Room 6 Story: 1st Story Wall: West Interior Year 2018
Treatment
Photo type: After 002_004003_fy18_b_0000370
Image #: 002_004003_fy18_b_0000370
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair: