Bc 51 29SJ 395 Room: Kiva 7 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: SW Quad, NW Quad
Start: 24/10/2018 End: 24/10/2018 Person Days: 1.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Kiva 7 Story: 1st Story Wall: SW Quad Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000820
Image #: 022_004003_fy18_b_0000820
Catalog #:        Accession #: 914
Condition:
Loose wall caps: Unspecified
Stone Erosion: Unspecified
Mortar Erosion: Unspecified
Basal Erosion: Unspecified








Bc 51 29SJ 395 Room: Kiva 7 Story: 1st Story Wall: SW Quad Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000986
Image #: 022_004003_fy18_b_0000986
Catalog #:        Accession #: 914
Treatment:
Basal Wall Repair:
Repointing (sq ft): 11.0
Mortar (# buckets): 0.25








Bc 51 29SJ 395 Room: Kiva 7 Story: 1st Story Wall: NW Quad Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000821
Image #: 022_004003_fy18_b_0000821
Catalog #:        Accession #: 914
Condition:
Loose wall caps: Unspecified
Stone Erosion: Unspecified
Mortar Erosion: Unspecified
Basal Erosion: Unspecified








Bc 51 29SJ 395 Room: Kiva 7 Story: 1st Story Wall: NW Quad Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000987
Image #: 022_004003_fy18_b_0000987
Catalog #:        Accession #: 914
Treatment:
Basal Wall Repair:
Repointing (sq ft): 4.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.25