Bc 51 29SJ 395 Room: Kiva 4 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South
Start: 15/10/2018 End: 16/10/2018 Person Days: 2.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Kiva 4 Story: 1st Story Wall: East Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000811
Image #: 022_004003_fy18_b_0000811
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Kiva 4 Story: 1st Story Wall: East Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000978
Image #: 022_004003_fy18_b_0000978
Catalog #:        Accession #: 914
Treatment:
Repointing (sq ft): 24.0
Stone replaced (#): 30.0
Mortar (# buckets): 6.0








Bc 51 29SJ 395 Room: Kiva 4 Story: 1st Story Wall: South Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000812
Image #: 022_004003_fy18_b_0000812
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Kiva 4 Story: 1st Story Wall: South Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000979
Image #: 022_004003_fy18_b_0000979
Catalog #:        Accession #: 914
Treatment:
Repointing (sq ft): 5.0
Stone replaced (#): 20.0
Mortar (# buckets): 4.0