Bc 51 29SJ 395 Room: Room 56 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, North
Start: 7/8/2018 End: 7/8/2018 Person Days: 1.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 56 Story: 1st Story Wall: North Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000792
Image #: 022_004003_fy18_b_0000792
Catalog #:        Accession #: 914
Condition:
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 56 Story: 1st Story Wall: North Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000960
Image #: 022_004003_fy18_b_0000960
Catalog #:        Accession #: 914
Treatment:
Basal Wall Repair:
Repointing (sq ft): 4.0
Masonry: 1.0
Mortar (# buckets): 1.5








Bc 51 29SJ 395 Room: Room 56 Story: 1st Story Wall: North Exterior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000793
Image #: 022_004003_fy18_b_0000793
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 56 Story: 1st Story Wall: North Exterior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000961
Image #: 022_004003_fy18_b_0000961
Catalog #:        Accession #: 914
Treatment:
Basal Wall Repair:
Repointing (sq ft): 16.0
Masonry: 4.0
Stone replaced (#): 3.0
Mortar (# buckets): 1.5