Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 29/8/2018 End: 6/9/2018 Person Days: 2.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Wall: North Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000999
Image #: 022_004003_fy18_b_0000999
Catalog #:        Accession #: 914
Condition:
Loose wall caps: Severe
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Wall: North Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000940
Image #: 022_004003_fy18_b_0000940
Catalog #:        Accession #: 914
Treatment:
Basal Wall Repair:
Repointing (sq ft): 6.0
Masonry: 5.0
Stone replaced (#): 10.0
Mortar (# buckets): 3.0








Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Wall: West Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0001000
Image #: 022_004003_fy18_b_0001000
Catalog #:        Accession #: 914
Condition:
Loose wall caps: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Wall: West Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000941
Image #: 022_004003_fy18_b_0000941
Catalog #:        Accession #: 914
Treatment:
Basal Wall Repair:
Repointing (sq ft): 2.0
Masonry: 2.0
Stone replaced (#): 7.0
Mortar (# buckets): 2.0