Bc 51 29SJ 395 Room: Room 41 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South
Start: 11/10/2018 End: 11/10/2018 Person Days: 1.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 41 Story: 1st Story Wall: North Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000765
Image #: 022_004003_fy18_b_0000765
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 41 Story: 1st Story Wall: North Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000928
Image #: 022_004003_fy18_b_0000928
Catalog #:        Accession #: 914
Treatment:
Basal Wall Repair:
Repointing (sq ft): 4.0
Stone replaced (#): 4.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 41 Story: 1st Story Wall: South Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000766
Image #: 022_004003_fy18_b_0000766
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 41 Story: 1st Story Wall: South Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000929
Image #: 022_004003_fy18_b_0000929
Catalog #:        Accession #: 914
Treatment:
Repointing (sq ft): 6.0
Stone replaced (#): 10.0
Mortar (# buckets): 1.0