Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 30/9/2018 End: 30/9/2018 Person Days: 2.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: South Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000755
Image #: 022_004003_fy18_b_0000755
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: South Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000918
Image #: 022_004003_fy18_b_0000918
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 12.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: West Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000756
Image #: 022_004003_fy18_b_0000756
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: West Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000919
Image #: 022_004003_fy18_b_0000919
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 9.0
Masonry: 1.125
Stone fresh: 16.0
Mortar (# buckets): 1.0