Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 30/9/2018 End: 1/10/2018 Person Days: 2.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Wall: South Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000751
Image #: 022_004003_fy18_b_0000751
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Wall: South Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000914
Image #: 022_004003_fy18_b_0000914
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 12.5
Stone fresh: 6.0
Mortar (# buckets): 1.0








Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Wall: West Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000752
Image #: 022_004003_fy18_b_0000752
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Wall: West Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000915
Image #: 022_004003_fy18_b_0000915
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 23.5
Stone fresh: 3.0
Mortar (# buckets): 1.0