Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East
Start: 11/10/2018 End: 16/10/2018 Person Days: 7.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: North Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_a_0000169
Image #: 022_004003_fy18_a_0000169
Catalog #:        Accession #: 914
Condition:
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: North Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0001006
Image #: 022_004003_fy18_b_0001006
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 6.4
Masonry: 2.0
Stone replaced (#): 2.0
Stone fresh: 14.0
Mortar (# buckets): 1.0








Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: East Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_a_0000170
Image #: 022_004003_fy18_a_0000170
Catalog #:        Accession #: 914
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: East Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0001007
Image #: 022_004003_fy18_b_0001007
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 14.0
Masonry: 4.0
Stone replaced (#): 2.0
Stone fresh: 12.0
Mortar (# buckets): 2.5