Pueblo Bonito 29SJ 387 Room: Room 95 Story: 1st Story Year 2018
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 16/4/2018 End: 16/4/2018 Person Days: 0.25
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Room 95 Story: 1st Story Wall: North Interior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000039
Image #: 022_004003_fy18_b_0000039
Catalog #:        Accession #: 914
Condition:
Mortar Erosion: Unspecified








Pueblo Bonito 29SJ 387 Room: Room 95 Story: 1st Story Wall: North Interior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000150
Image #: 022_004003_fy18_b_0000150
Catalog #:        Accession #: 914
Treatment:
Basal Wall Repair:
Repointing (sq ft): 3.0
Stone replaced (#): 0.0
Mortar (# buckets): 0.1








Pueblo Bonito 29SJ 387 Room: Room 95 Story: 1st Story Wall: West Exterior Year 2018
Condition
Photo type: Before 022_004003_fy18_b_0000083
Image #: 022_004003_fy18_b_0000083
Catalog #:        Accession #: 914
Condition:
Mortar Erosion: Unspecified








Pueblo Bonito 29SJ 387 Room: Room 95 Story: 1st Story Wall: West Exterior Year 2018
Treatment
Photo type: After 022_004003_fy18_b_0000194
Image #: 022_004003_fy18_b_0000194
Catalog #:        Accession #: 914
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 56.0
Stone replaced (#): 0.0
Mortar (# buckets): 2.0