Pueblo Bonito 29SJ 387 Room: Room 244 Story: 2nd Story Year 2017
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South
Start: 22/11/2017 End: 27/11/2017 Person Days: 1.5
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Room 244 Story: 2nd Story Wall: South Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_a_0000365
Image #: 022_004003_fy17_a_0000365
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Pueblo Bonito 29SJ 387 Room: Room 244 Story: 2nd Story Wall: South Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0001050
Image #: 022_004003_fy17_b_0001050
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 19.0
Stone replaced (#): 0.0
Mortar (# buckets): 0.5