Pueblo Bonito 29SJ 387 Room: Room 115 Story: 2nd Story Year 2017
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South
Start: 7/9/2017 End: 11/9/2017 Person Days: 1.0
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Room 115 Story: 2nd Story Wall: East Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_a_0000201
Image #: 022_004003_fy17_a_0000201
Catalog #:        Accession #: 910
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified
Basal Erosion: Unspecified








Pueblo Bonito 29SJ 387 Room: Room 115 Story: 2nd Story Wall: East Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000948
Image #: 022_004003_fy17_b_0000948
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 11.0
Stone replaced (#): 0.0
Mortar (# buckets): 0.25








Pueblo Bonito 29SJ 387 Room: Room 115 Story: 2nd Story Wall: South Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_a_0000202
Image #: 022_004003_fy17_a_0000202
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Pueblo Bonito 29SJ 387 Room: Room 115 Story: 2nd Story Wall: South Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000949
Image #: 022_004003_fy17_b_0000949
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 5.0
Stone replaced (#): 0.0
Mortar (# buckets): 0.25