Wijiji 29SJ 577 | Room: Room 35 | Story: 1st Story | Year 2003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Walls recorded: North, East | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overall Comments: |
Wijiji 29SJ 577 | Room: Room 35 | Story: 1st Story | Wall: North | Exterior | Year 2003 |
Condition: |
Mortar Erosion: Poor |
Wijiji 29SJ 577 | Room: Room 35 | Story: 1st Story | Wall: North | Exterior | Year 2003 |
Treatment: |
Vertical Wall Repair: |
Repointing (sq ft): 11.0 |
Treatment comment: Information came from a map located in "Condition Assessment-2003 Wijiji" that crew indicated work was done on wall. |
Wijiji 29SJ 577 | Room: Room 35 | Story: 1st Story | Wall: East | Interior | Year 2003 |
Condition: |
Loose wall caps: Poor |
Mortar Erosion: Poor |
Note: |
mortar erosion on capping Original db Other: capping only Original db Condition: Poor |
Wijiji 29SJ 577 | Room: Room 35 | Story: 1st Story | Wall: East | Interior | Year 2003 |
Treatment: |
Repointing (sq ft): 4.0 |
Stone replaced (#): 3.0 |
Mortar (# buckets): 2.0 |