Pueblo Pintado 29Mc 166 Room: Room 35 C Story: 1st Story Year 2017
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South
Start: 9/8/2017 End: 10/8/2017 Person Days: 1.0
 
Overall Comments:



Pueblo Pintado 29Mc 166 Room: Room 35 C Story: 1st Story Wall: East Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000774
Image #: 022_004003_fy17_b_0000774
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Pueblo Pintado 29Mc 166 Room: Room 35 C Story: 1st Story Wall: East Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_a_0000081
Image #: 022_004003_fy17_a_0000081
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 10.0
Stone replaced (#): 5.0
Mortar (# buckets): 0.75








Pueblo Pintado 29Mc 166 Room: Room 35 C Story: 1st Story Wall: South Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000775
Image #: 022_004003_fy17_b_0000775
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Pueblo Pintado 29Mc 166 Room: Room 35 C Story: 1st Story Wall: South Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_a_0000082
Image #: 022_004003_fy17_a_0000082
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Stone replaced (#): 2.0
Mortar (# buckets): 0.5