Hungo Pavi 29SJ 1918 Room: Room 14 Story: 2nd Story Year 2017
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, North
Start: 19/6/2017 End: 22/6/2017 Person Days: 2.5
 
Overall Comments:



Hungo Pavi 29SJ 1918 Room: Room 14 Story: 2nd Story Wall: North Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000538
Image #: 022_004003_fy17_b_0000538
Catalog #:        Accession #: 910
Condition:
Stone Erosion: Unspecified
Mortar Erosion: Unspecified








Hungo Pavi 29SJ 1918 Room: Room 14 Story: 2nd Story Wall: North Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000642
Image #: 022_004003_fy17_b_0000642
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 22.0
Stone replaced (#): 3.0
Mortar (# buckets): 0.5








Hungo Pavi 29SJ 1918 Room: Room 14 Story: 2nd Story Wall: North Exterior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000539
Image #: 022_004003_fy17_b_0000539
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Hungo Pavi 29SJ 1918 Room: Room 14 Story: 2nd Story Wall: North Exterior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000643
Image #: 022_004003_fy17_b_0000643
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 256.0
Stone replaced (#): 9.0
Mortar (# buckets): 2.5