Wijiji 29SJ 577 Room: Room 85 Story: 1st Story Year 2017
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, West
Start: 27/4/2017 End: 27/4/2017 Person Days: 1.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 85 Story: 1st Story Wall: East Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000150
Image #: 022_004003_fy17_b_0000150
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified
Basal Erosion: Unspecified








Wijiji 29SJ 577 Room: Room 85 Story: 1st Story Wall: East Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000317
Image #: 022_004003_fy17_b_0000317
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 8.0
Mortar (# buckets): 0.25








Wijiji 29SJ 577 Room: Room 85 Story: 1st Story Wall: West Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000151
Image #: 022_004003_fy17_b_0000151
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Wijiji 29SJ 577 Room: Room 85 Story: 1st Story Wall: West Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000318
Image #: 022_004003_fy17_b_0000318
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 1.0
Mortar (# buckets): 0.25