Wijiji 29SJ 577 Room: Room 42 Story: 3rd Story Year 2017
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North
Start: 30/3/2017 End: 5/4/2017 Person Days: 4.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 42 Story: 3rd Story Wall: North Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000042
Image #: 022_004003_fy17_b_0000042
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Wijiji 29SJ 577 Room: Room 42 Story: 3rd Story Wall: North Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000217
Image #: 022_004003_fy17_b_0000217
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 20.0
Mortar (# buckets): 2.0