Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Year 2017
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, East
Start: 13/3/2017 End: 14/3/2017 Person Days: 2.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Wall: North Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000016
Image #: 022_004003_fy17_b_0000016
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Wall: North Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000193
Image #: 022_004003_fy17_b_0000193
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 18.0
Masonry: 6.0
Stone replaced (#): 10.0
Stone fresh: 10.0
Mortar (# buckets): 2.0








Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Wall: East Interior Year 2017
Condition
Photo type: Before 022_004003_fy17_b_0000017
Image #: 022_004003_fy17_b_0000017
Catalog #:        Accession #: 910
Condition:
Mortar Erosion: Unspecified








Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Wall: East Interior Year 2017
Treatment
Photo type: After 022_004003_fy17_b_0000194
Image #: 022_004003_fy17_b_0000194
Catalog #:        Accession #: 910
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 20.0
Masonry: 8.0
Stone replaced (#): 6.0
Stone fresh: 4.0
Mortar (# buckets): 2.0