Kin Kletso 29SJ 393 Room: Room 11 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 11/6/1992 End: 11/6/1992 Person Days: 1.5
 
Overall Comments: 1/3 Rhoplex/ water 4 Parts soil, 2 parts sand, 2 parts clay Pastelike mixture, amended soil mortar.



Kin Kletso 29SJ 393 Room: Room 11 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 078_08
Image #: 111000
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Heavy loose or fallen chinking.








Kin Kletso 29SJ 393 Room: Room 11 Story: 1st Story Wall: South Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.5








Kin Kletso 29SJ 393 Room: Room 11 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 078_09
Image #: 111001
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Heavy loose or fallen chinking.








Kin Kletso 29SJ 393 Room: Room 11 Story: 1st Story Wall: West Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Stone fresh: 2.0
Mortar (# buckets): 1.0