Kin Kletso 29SJ 393 Room: Room 1 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South, West
Start: 4/6/1992 End: 8/6/1992 Person Days: 3.0
 
Overall Comments: 1/3 Rhoplex/ Water 4 parts soil, 2 parts sand, 2 parts clay Amended soil mortar, pastelike mixture.



Kin Kletso 29SJ 393 Room: Room 1 Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 076_04
Image #: 110977
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Light
Basal Erosion: Light








Kin Kletso 29SJ 393 Room: Room 1 Story: 1st Story Wall: North Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Mortar (# buckets): 1.5








Kin Kletso 29SJ 393 Room: Room 1 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 076_03
Image #: 110976
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light








Kin Kletso 29SJ 393 Room: Room 1 Story: 1st Story Wall: South Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.5








Kin Kletso 29SJ 393 Room: Room 1 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 076_01
Image #: 110974
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Heavy
Basal Erosion: Heavy








Kin Kletso 29SJ 393 Room: Room 1 Story: 1st Story Wall: West Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 8.0
Mortar (# buckets): 1.0