Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 32 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, West, West
Start: 30/7/1992 End: 3/8/1992 Person Days: 2.5
 
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Amended soil mortar, pastelike mixture.



Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 32 Story: 1st Story Wall: East Interior Year 1992
Condition
Photo type: Before 049_04
Image #: 110674
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Light
Basal Erosion: Light








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 32 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 066_01
Image #: 110855
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 9.0
Stone replaced (#): 7.0
Stone fresh: 6.0
Mortar (# buckets): 2.0








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 32 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 049_03
Image #: 110673
Catalog #:        Accession #:
Condition:
Note:
     No pre-treatment condition documented.








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 32 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 066_02
Image #: 110856
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 22.0
Stone replaced (#): 2.0
Stone fresh: 9.0
Mortar (# buckets): 2.5








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 32 Story: 1st Story Wall: West Exterior Year 1992
Condition
Condition:
Mortar Erosion: Light
Basal Erosion: Light








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 32 Story: 1st Story Wall: West Exterior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.5