Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 30 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, East
Start: 10/8/1992 End: 10/8/1992 Person Days: 1.0
 
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture.



Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 30 Story: 1st Story Wall: East Interior Year 1992
Condition
Condition:
Mortar Erosion: Heavy








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 30 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 067_05
Image #: 110871
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 10.0
Stone replaced (#): 2.0
Mortar (# buckets): 2.0








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 30 Story: 1st Story Wall: East Exterior Year 1992
Condition
Photo type: No Before Photo Available 067_04
Image #: 110870
Catalog #:        Accession #:
Condition:
Mortar Erosion: Heavy
Basal Erosion: Light