Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 26 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West, West
Start: 23/7/1992 End: 28/7/1992 Person Days: 1.5
 
Overall Comments: 1/4 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture.



Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 26 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 051_06
Image #: 110700
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Heavy loose or fallen chinking.








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 26 Story: 1st Story Wall: South Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 13.0
Stone replaced (#): 1.0
Mortar (# buckets): 1.5








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 26 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 049_07
Image #: 110677
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 26 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 062_03
Image #: 110814
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Mortar (# buckets): 0.5








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 26 Story: 1st Story Wall: West Exterior Year 1992
Condition
Condition:
Note:
     Pre-treatment condition not documented.








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 26 Story: 1st Story Wall: West Exterior Year 1992
Treatment
Photo type: After 062_02
Image #: 110813
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 4.0
Mortar (# buckets): 0.5