Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 24 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South, West
Start: 29/7/1992 End: 30/7/1992 Person Days: 2.0
 
Overall Comments: 1/4 Rhoplex/ water 2 parts soil, 1 part sand, 0.5 part clay Pastelike mixture.



Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 24 Story: 1st Story Wall: East Interior Year 1992
Condition
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 24 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 065_05
Image #: 110848
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.5








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 24 Story: 1st Story Wall: South Interior Year 1992
Condition
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light or fallen chinking.








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 24 Story: 1st Story Wall: South Interior Year 1992
Treatment
Photo type: After 065_04
Image #: 110847
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 8.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.5








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 24 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 051_02
Image #: 110696
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 24 Story: 1st Story Wall: West Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 5.0
Mortar (# buckets): 0.5