Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 21 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, West, North
Start: 11/8/1992 End: 11/8/1992 Person Days: 0.5
 
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture



Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 21 Story: 1st Story Wall: East Interior Year 1992
Condition
Condition:
Mortar Erosion: Light








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 21 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 061_02
Image #: 110801
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 3.0
Mortar (# buckets): 0.25








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 21 Story: 1st Story Wall: West Exterior Year 1992
Condition
Photo type: Before 058_08
Image #: 110771
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 21 Story: 1st Story Wall: West Exterior Year 1992
Treatment
Photo type: After 061_01
Image #: 110800
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.25








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 21 Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 058_07
Image #: 110770
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 21 Story: 1st Story Wall: North Interior Year 1992
Treatment
Photo type: After 061_03
Image #: 110802
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 5.0
Mortar (# buckets): 1.0