Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 9 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 30/7/1992 End: 4/8/1992 Person Days: 3.5
 
Overall Comments: 1/4 Rhoplex/ water 2 parts soil, 1 part sand, 0.5 part clay Pastelike mixture.



Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 9 Story: 1st Story Wall: East Interior Year 1992
Condition
Photo type: Before 050_08
Image #: 110690
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 9 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 073_11
Image #: 110942
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 20.0
Stone replaced (#): 8.0
Mortar (# buckets): 2.5