Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South, West
Start: 22/6/1992 End: 25/6/1992 Person Days: 1.5
 
Overall Comments: 1/3 Rhoplex/ water 4 parts soil, 2 parts sand, 2 parts clay Pastelike mixture



Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: North Interior Year 1992
Condition
Condition:
Stone Erosion: Light
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: North Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Masonry: 2.0
Stone replaced (#): 7.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: South Interior Year 1992
Condition
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: South Interior Year 1992
Treatment
Photo type: After 043_08
Image #: 110619
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 025_08
Image #: 110415
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Heavy loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 38 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 043_09
Image #: 110620
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 11.0
Masonry: 4.0
Stone replaced (#): 9.0
Mortar (# buckets): 1.5