Bc 51 29SJ 395 Room: Room 51 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 6/7/1992 End: 6/7/1992 Person Days: 0.5
 
Overall Comments: 1/3 Rhoplex/ water 4 parts soil, 3 parts sand, 1 part clay Pastelike mixture



Bc 51 29SJ 395 Room: Room 51 Story: 1st Story Wall: South Interior Year 1992
Condition
Condition:
Mortar Erosion: Light
Basal Erosion: Light








Bc 51 29SJ 395 Room: Room 51 Story: 1st Story Wall: South Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 2.0
Stone fresh: 3.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 51 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 031_11
Image #: 110488
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light








Bc 51 29SJ 395 Room: Room 51 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 035_04
Image #: 110529
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Mortar (# buckets): 0.5