Bc 51 29SJ 395 Room: Room 50 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, West, West
Start: 6/7/1992 End: 7/7/1992 Person Days: 3.0
 
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 3 parts sand, 1 part clay Pastelike mixture



Bc 51 29SJ 395 Room: Room 50 Story: 1st Story Wall: East Interior Year 1992
Condition
Photo type: Before 031_12
Image #: 110489
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen masonry.








Bc 51 29SJ 395 Room: Room 50 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 034_09
Image #: 110522
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 8.0
Masonry: 1.0
Stone replaced (#): 10.0
Mortar (# buckets): 1.0








Bc 51 29SJ 395 Room: Room 50 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 030_02
Image #: 110467
Catalog #:        Accession #:
Condition:
Loose wall caps: Light
Stone Erosion: Light
Mortar Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 50 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 034_10
Image #: 110523
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 10.0
Stone replaced (#): 12.0
Mortar (# buckets): 1.0








Bc 51 29SJ 395 Room: Room 50 Story: 1st Story Wall: West Exterior Year 1992
Condition
Condition:
Note:
     No pre-treatment conditions for this wall were documented.








Bc 51 29SJ 395 Room: Room 50 Story: 1st Story Wall: West Exterior Year 1992
Treatment
Photo type: After 034_07
Image #: 110520
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 4.0
Stone replaced (#): 3.0
Mortar (# buckets): 1.0