Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West
Start: 7/7/1992 End: 7/7/1992 Person Days: 1.0
 
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Watery mixture



Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 031_03
Image #: 110480
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Wall: North Interior Year 1992
Treatment
Photo type: After 037_05
Image #: 110552
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Wall: West Interior Year 1992
Condition
Condition:
Stone Erosion: Light
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 46 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 037_06
Image #: 110553
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Masonry: 3.0
Stone replaced (#): 10.0
Mortar (# buckets): 0.5