Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East
Start: 23/6/1992 End: 29/6/1992 Person Days: 2.0
 
Overall Comments: 1/4 Rhoplex/ water 2 parts soil, 1 part sand, 1 part clay Pastelike mixture



Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 029_05
Image #: 110458
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Wall: South Interior Year 1992
Treatment
Photo type: After 046_12
Image #: 110658
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Stone replaced (#): 3.0
Mortar (# buckets): 2.0








Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Wall: East Interior Year 1992
Condition
Photo type: Before 029_11
Image #: 110464
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Heavy loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 046_10
Image #: 110656
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 7.0
Stone replaced (#): 15.0
Stone fresh: 1.0
Mortar (# buckets): 4.0