Bc 51 29SJ 395 Room: Room 39 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 22/6/1992 End: 22/6/1992 Person Days: 0.5
 
Overall Comments: 1/3 Rhoplex/ water 2 parts soil, 1 part sand, 1 part clay Pastelike mixture



Bc 51 29SJ 395 Room: Room 39 Story: 1st Story Wall: East Exterior Year 1992
Condition
Condition:
Mortar Erosion: Heavy
Basal Erosion: Heavy








Bc 51 29SJ 395 Room: Room 39 Story: 1st Story Wall: East Exterior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 5.0
Stone replaced (#): 4.0
Mortar (# buckets): 0.5