Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South
Start: 22/6/1992 End: 22/6/1992 Person Days: 0.5
 
Overall Comments: 1/3 Rhoplex/ water 4 parts soil, 2 parts sand, 2 parts clay Pastelike mixture.



Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 027_09
Image #: 110439
Catalog #:        Accession #:
Condition:
Note:
     No pre-treatment conditions for North wall were documented.








Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Wall: North Interior Year 1992
Treatment
Treatment:
Repointing (sq ft): 4.0
Mortar (# buckets): 0.25








Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 027_10
Image #: 110440
Catalog #:        Accession #:
Condition:
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Heavy loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 34 Story: 1st Story Wall: South Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 9.0
Stone replaced (#): 3.0
Mortar (# buckets): 0.25