Bc 51 29SJ 395 Room: Room 25 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South
Start: 18/6/1992 End: 22/6/1992 Person Days: 1.5
 
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture.



Bc 51 29SJ 395 Room: Room 25 Story: 1st Story Wall: East Interior Year 1992
Condition
Condition:
Loose wall caps: Heavy
Stone Erosion: Heavy
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 25 Story: 1st Story Wall: East Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 16.0
Masonry: 16.0
Stone replaced (#): 6.0
Mortar (# buckets): 6.0








Bc 51 29SJ 395 Room: Room 25 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 028_08
Image #: 110449
Catalog #:        Accession #:
Condition:
Loose wall caps: Other
Stone Erosion: Heavy
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 25 Story: 1st Story Wall: South Interior Year 1992
Treatment
Photo type: After 045_04
Image #: 110639
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Masonry: 6.0
Stone replaced (#): 4.0
Mortar (# buckets): 4.0