Bc 51 29SJ 395 Room: Room 24 B Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South
Start: 30/6/1992 End: 6/7/1992 Person Days: 5.0
 
Overall Comments: 1/3 Rhoplex/ Water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture.



Bc 51 29SJ 395 Room: Room 24 B Story: 1st Story Wall: North Interior Year 1992
Condition
Photo type: Before 033_05
Image #: 110506
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 24 B Story: 1st Story Wall: North Interior Year 1992
Treatment
Photo type: After 034_04
Image #: 110517
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Masonry: 6.0
Stone replaced (#): 10.0
Mortar (# buckets): 1.0








Bc 51 29SJ 395 Room: Room 24 B Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 033_06
Image #: 110507
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Heavy
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 24 B Story: 1st Story Wall: South Interior Year 1992
Treatment
Photo type: After 034_03
Image #: 110516
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 12.0
Masonry: 12.0
Mortar (# buckets): 1.0