Bc 51 29SJ 395 Room: Room 23 A Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South, West
Start: 29/6/1992 End: 1/7/1992 Person Days: 1.5
 
Overall Comments: 1/4.5 Rhoplex/ water 2 parts soil, 1 part sand, 0.5 part clay Pastelike mixture



Bc 51 29SJ 395 Room: Room 23 A Story: 1st Story Wall: East Interior Year 1992
Condition
Photo type: Before 030_12
Image #: 110477
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 23 A Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 036_07
Image #: 110542
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 5.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 23 A Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 033_03
Image #: 110504
Catalog #:        Accession #:
Condition:
Mortar Erosion: Heavy
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 23 A Story: 1st Story Wall: South Interior Year 1992
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 4.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 23 A Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 033_04
Image #: 110505
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 23 A Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 036_09
Image #: 110544
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Stone replaced (#): 8.0
Mortar (# buckets): 1.0