Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, West, North
Start: 1/7/1992 End: 6/7/1992 Person Days: 1.5
 
Overall Comments: 1/3 Rhoplex/ water 2 parts soil, 2 parts sand, 0.5 part clay Pastelike mixture



Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: East Interior Year 1992
Condition
Photo type: Before 031_01
Image #: 110478
Catalog #:        Accession #:
Condition:
Mortar Erosion: Light
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: East Interior Year 1992
Treatment
Photo type: After 038_06
Image #: 110563
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 5.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 031_02
Image #: 110479
Catalog #:        Accession #:
Condition:
Mortar Erosion: Heavy
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 038_07
Image #: 110564
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 3.0
Mortar (# buckets): 0.5








Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: North Exterior Year 1992
Condition
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Basal Erosion: Heavy








Bc 51 29SJ 395 Room: Room 22 Story: 1st Story Wall: North Exterior Year 1992
Treatment
Photo type: After 038_09
Image #: 110566
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 1.0
Masonry: 1.0
Stone fresh: 7.0
Mortar (# buckets): 1.5