Bc 51 29SJ 395 Room: Room 8 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 18/6/1992 End: 18/6/1992 Person Days: 1.0
 
Overall Comments: 1/3 Rhoplex/ water 2 parts soil, 1 part sand, 1 part clay Pastelike mixture



Bc 51 29SJ 395 Room: Room 8 Story: 1st Story Wall: South Interior Year 1992
Condition
Photo type: Before 028_10
Image #: 110451
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Basal Erosion: Heavy
Note:
     Heavy loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 8 Story: 1st Story Wall: South Interior Year 1992
Treatment
Photo type: After 045_07
Image #: 110642
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Stone replaced (#): 8.0
Mortar (# buckets): 1.0








Bc 51 29SJ 395 Room: Room 8 Story: 1st Story Wall: West Interior Year 1992
Condition
Photo type: Before 028_11
Image #: 110452
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Note:
     Heavy loose or fallen chinking.








Bc 51 29SJ 395 Room: Room 8 Story: 1st Story Wall: West Interior Year 1992
Treatment
Photo type: After 045_08
Image #: 110643
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 13.0
Mortar (# buckets): 0.75