Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Year 1992 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Walls recorded: North, East, South, West | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overall Comments: 1/4.5 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture |
Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Wall: North | Interior | Year 1992 |
Condition: |
Note: |
No before treatment data documented. |
Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Wall: North | Interior | Year 1992 |
Treatment: |
Vertical Wall Repair: |
Repointing (sq ft): 4.0 |
Masonry: 4.0 |
Mortar (# buckets): 0.5 |
Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Wall: East | Interior | Year 1992 |
Condition: |
Stone Erosion: Light |
Mortar Erosion: Light |
Basal Erosion: Light |
Note: |
Light loose or fallen chinking. |
Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Wall: East | Interior | Year 1992 |
Treatment: |
Vertical Wall Repair: |
Basal Wall Repair: |
Repointing (sq ft): 21.0 |
Masonry: 21.0 |
Mortar (# buckets): 1.5 |
Treatment comment: Replaced site stone number not documented. |
Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Wall: South | Interior | Year 1992 |
Condition: |
Stone Erosion: Light |
Basal Erosion: Light |
Note: |
Light loose chinking. |
Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Wall: South | Interior | Year 1992 |
Treatment: |
Vertical Wall Repair: |
Basal Wall Repair: |
Repointing (sq ft): 17.0 |
Masonry: 17.0 |
Stone replaced (#): 8.0 |
Mortar (# buckets): 2.0 |
Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Wall: West | Interior | Year 1992 |
Condition: |
Stone Erosion: Light |
Mortar Erosion: Light |
Basal Erosion: Light |
Note: |
Light loose or fallen chinking. |
Bc 51 29SJ 395 | Room: Room 1 | Story: 1st Story | Wall: West | Interior | Year 1992 |
Treatment: |
Vertical Wall Repair: |
Basal Wall Repair: |
Repointing (sq ft): 4.0 |
Masonry: 4.0 |
Stone replaced (#): 4.0 |
Mortar (# buckets): 0.5 |