Bc 50-Tseh So 29SJ 394 Room: Kiva 1 Story: 1st Story Year 1992
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: NW Quad, SW Quad
Start: 14/7/1992 End: 15/7/1992 Person Days: 2.0
 
Overall Comments: 1/4 Rhoplex/ water 4 parts soil, 2 parts sand, 1 part clay Pastelike mixture



Bc 50-Tseh So 29SJ 394 Room: Kiva 1 Story: 1st Story Wall: NW Quad Interior Year 1992
Condition
Photo type: Before 007_05
Image #: 110219
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Heavy
Basal Erosion: Light








Bc 50-Tseh So 29SJ 394 Room: Kiva 1 Story: 1st Story Wall: NW Quad Interior Year 1992
Treatment
Photo type: After 014_11
Image #: 110299
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 16.0
Stone replaced (#): 3.0
Mortar (# buckets): 1.5








Bc 50-Tseh So 29SJ 394 Room: Kiva 1 Story: 1st Story Wall: SW Quad Interior Year 1992
Condition
Photo type: Before 007_04
Image #: 110218
Catalog #:        Accession #:
Condition:
Stone Erosion: Light
Mortar Erosion: Heavy
Basal Erosion: Light
Note:
     Light loose or fallen chinking.








Bc 50-Tseh So 29SJ 394 Room: Kiva 1 Story: 1st Story Wall: SW Quad Interior Year 1992
Treatment
Photo type: After 014_08
Image #: 110296
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 15.0
Mortar (# buckets): 1.0